Project Support | SHENGMEI Mobile Compactor Shelving
Project Support

The container landing isn’t the finish line. That’s where support starts.

Planning drawings before you sign. Export packing that survives the voyage. Assembly guidance and remote commissioning once the crates arrive — and a service line that answers long after the invoice.

Container port with gantry cranes loading an export cargo ship
Factory-direct export supply
Support Services

Three services that decide how a project feels.

Hardware wins the tender. Support wins the decade. Each service below is handled by Shengmei’s own engineers — from your first drawing to the last assembly question, wherever in the world your archive is.

01Before order

Planning and Drawings

Send us the room dimensions and collection type. Our engineers return a bay-by-bay CAD layout, aisle-by-aisle capacity estimate and a specification sheet your evaluation committee can score directly.

    You receive
  • Bay-by-bay CAD floor layout
  • Capacity & load calculation
  • Tender-ready specification sheet
  • Returned within 2 working days
02At shipment

Export Packing and Shipping

Every carriage is flat-packed, part-numbered and container-loaded to a packing list that matches your layout — so the right part is the first one out of the crate, not the last. Packing is rated for long-haul sea freight and repeated handling.

    You receive
  • Flat-pack export cartons & pallets
  • Container loading plan & packing list
  • Part numbering matched to your drawings
  • Export documents for customs clearance
03After landing

Assembly Support and Remote Commissioning

Your own team — or a local contractor — assembles the system using the numbered parts, illustrated manual and step-by-step video. Our engineer joins by video call for the first bay and stays on for the final checks.

    You receive
  • Illustrated assembly manual (EN)
  • Step-by-step assembly video
  • Live video walkthrough with our engineer
  • Remote commissioning checklist
What’s in the Crate

Every container ships with a matched packing list.

Open a crate and you’ll find the same numbers as the CAD layout — each pack labeled with its bay position, so assembly starts from the right end of the room.

Rail kitCRATE A
  • Rail sections — cut to layout length
  • Anchor bolts & shim pack
  • Joint sleeves & end stops
  • Position plan sheet
Carriage framesCRATE B
  • Upright assemblies — pre-welded
  • Base channels & rollers
  • Anti-tilt lock set
  • Bay number badges
Shelving decksCRATE C
  • Deck panels — per bay quantity
  • Shelf dividers & label holders
  • Dust tops & side panels
  • Clip hardware bag
Controls & sparesCRATE D
  • Drive units — if electric/smart
  • Touchscreen heads & cables
  • Hand wheels & locks
  • Spare-parts kit & tools
Remote Support Channels

Help that reaches your time zone.

Support doesn’t depend on a site visit. Three channels, staffed by the same engineers who designed your layout — with published response commitments.

≤ 4 h reply Video call walkthroughs Scheduled sessions for the first bay, tricky rooms and final checks — camera on your side, answers on ours.
≤ 24 h reply WhatsApp & email desk Send photos of any part, any question — replies with annotated drawings from the engineer who made them.
48 h dispatch Spare-parts dispatch In-warranty parts air-shipped within 48 hours of confirmation, with a fitted-by-video guide for each item.
Quality Release

Nothing ships until it passes four gates.

Every export order is inspected against the tender specification before a single crate is closed — and the photo and video dossier travels to you as proof.

01Material Check

Raw materials and finished parts verified against the bill of materials before assembly begins.

  • Steel gauge verification
  • Powder-coat thickness report
  • Hardware count vs BOM
02Function Test

Every motor, screen, lock and sensor is powered up and exercised — not sampled, each one.

  • 100% drive test per carriage
  • Touchscreen & RFID calibration
  • Safety sensor response check
03Load Trial

Aisles are cycled at full file load to confirm smooth travel and true rail alignment.

  • Full-load aisle cycling
  • Rail alignment re-check
  • Wheel & bearing inspection
04Packing Audit

Each crate is photographed and videoed before closing, then matched to the packing list.

  • Photo + video of every crate
  • Crate ID vs packing list
  • Container loading & lashing check
Third-party inspection is welcome — SGS, BV, TÜV or your own inspector may audit any gate at our factory. Any component that fails your inspection is replaced before shipment, at our cost.
From Signature to Shelf

A support timeline you can plan around.

Drawings deliveredLayout, capacity and specification for tender reviewDay 0–2
Production startFrames cut, folded and powder-coated in our factoryWeek 1–3
Packed & dispatchedFlat-pack cartons, part numbering matched to drawings, container loading planWeek 4
Assembled & checkedYour team builds with video support; remote commissioning checklist signed offWeek 5–6
10 yrStructural warranty on frames and carriages
48 hSpare-part dispatch for in-warranty systems
LifetimeRemote technical support on every system supplied
2 daysLayout proposal turnaround from your drawings
Talk to Support

Planning a project? Start with the drawings.

Send the room dimensions and collection type — planning support is free, and the CAD layout you receive is exactly what your own assembly team will build from.

Request planning support →