Resources · Capacity Planning

How many boxes will the room hold? Do the maths in five minutes.

Capacity is the one number every purchase order defends. This guide shows the exact calculation our engineers run — then works a real 54 m² room from bare floor to a box count you can put in a requisition.

Have us run your numbers →
Mobile compactor bank with blue LED terminals and hand wheels, bays numbered for counting
Worked example

A 54 m² storeroom, counted end to end.

Typical government records room: a single doorway, two columns on the 6 m wall, boxes arriving at about 200 per year. Here is the whole calculation.

Measure the usable floor.6.0 × 9.0 m gross = 54 m². Deduct the 1.2 m main aisle along the long wall and the door swing: 38 m² remains for racking.54 m² − aisle + door swing = 38 m² net
Choose the bay.Standard records bay: 900 mm wide × 2400 mm high × 450 mm deep, six adjustable shelves. One bay occupies 1 m of run length.bay = 900 mm × 2400 mm × 450 mm · 6 shelves
Fix units per shelf.A 1000 mm shelf holds about ten standard A4/FC archive boxes (385 mm spines, two rows) or roughly 120 lever-arch files. We plan boxes here.6 shelves × 10 boxes = 60 boxes per bay
Multiply into modules.38 m² of rail run takes five mobile modules of six bays: 30 active bays, one open aisle at a time.5 modules × 6 bays × 60 boxes = 1,800 boxes
Same room, static shelving
1,800 vs 1,000 boxes
Mobile compaction stores about 1.8× the static-shelving count on the identical footprint — because only one aisle is ever open.
Net racking floor38 m²
Active bays30
Shelves per bay6
Boxes per shelf10
Years of headroom at +200/yr4+
Indicative figures for standard 385 × 270 × 260 mm boxes at 8–10 kg. Your final layout is verified bay by bay by our project engineers before fabrication.
Reference data

What one bay stores — and what the floor carries.

The two tables every facilities team asks for: storage yield per bay by media type, and the concentrated floor loads your structural engineer will want in writing.

Storage yield per 900 mm bay

MediaTypical load
Archive boxes (385 × 270 mm)55–65 boxes
Lever-arch files650–700 files
Hanging personnel files500–550 files
Bound volumes / books~1.6 linear metres per shelf
Roll film & plan cabinetsper-drawer layout
Six shelves per 2400 mm bay, evenly loaded. Shelf rating 45–80 kg depending on cabinet series.

Floor loading, in writing

SystemDesign load
Static shelving300–450 kg/m²
Mobile system, spread500–700 kg/m²
Mobile rail line, concentratedup to 1,000 kg/m²
Recommended slab checkby structural engineer
Compactors park the whole run’s weight on the rail strip when closed. We supply rail-point loads with every layout drawing.
Planning for growth

When the count stops fitting, pull the levers in this order.

+200 boxes a year sounds abstract until the last shelf is full. Each lever below buys years of headroom — the first costs shelf panels, the last costs a redesign. Planning the order on day one is what keeps a full room from becoming an emergency.

Lever one · a day’s work

Shelve out the empty positions

Bays ship with two shelf positions left open. Filling them adds up to 20 boxes per bay with no new steel, no new rails and no downtime — the cheapest capacity you will ever buy.

Cost: shelf panels only
Lever two · a few weeks

Extend the rail run

Rails are cut to length on site. Adding one six-bay module to each run takes the 54 m² example above from 1,800 to roughly 2,160 boxes — the floor plan barely changes.

Cost: one module per run
Lever three · the honest one

Re-zone, then add a second room

When front-zone files go inactive, move them to the deepest bank or a high-bay annexe and let the active room breathe again. We size the second room from the same count.

Cost: a labour day, then planning
Procurement checklist

Five numbers every quotation must state.

Two suppliers can quote the same room and land 30% apart on capacity. The difference hides in definitions. Before you sign, make sure all five numbers below are written on the quotation — and written the same way by every bidder.

Number 01

Bay module size, in mm

Width × depth × height per bay. A “900” bay can mean 900 mm pitch or 900 mm clear opening — one shelf of difference per bay, across every run.

Number 02

Boxes per bay, at shelf count

Capacity quoted “per system” means nothing without shelves per bay and units per shelf. Demand the same three-line breakdown the worked example above uses.

Number 03

Floor load, kg/m²

Compacted rails concentrate weight. Ask for the design load and the assumed spreader detail — your structural engineer signs against this number, not against photographs.

Number 04

Aisle count and clear width

Total capacity depends on how many aisles you freeze. Two 800 mm aisles serve traffic better than one 1,200 mm — and change the bay count either way.

Number 05

Headroom for growth, in bays

How many empty positions and rail extensions the design already allows. It is the cheapest capacity you will ever buy and the first thing a thin quote omits.

The whole guide in one line

Capacity, compressed.

Modules×Bays×Shelves×Units per shelf=Your box count

Fix any three factors and the fourth tells you when to stop buying cabinets — or when to call us before the room runs out.

Send the box count, get the layout back.

Tell us what you store and the room it lives in. A project engineer returns capacity, bay count and floor loads within two working days.

Request a capacity plan →