Applications · Overview

Six sectors, one storage logic.

An archive is an archive whether it sits in a government office, a courthouse or a hospital basement — what changes is who retrieves, how often, and how strictly access is controlled. This page maps each sector to the system that fits it, and the requirements that decide the choice.

Government archive building with columned facade

Government ArchivesRetention schedules, classification tiers and audit-ready access logs.Open sector →

Courthouse building with columned portico

Courts & Legal RecordsCase files and evidence under chain of custody and dual control.Open sector →

Public records center building with landscaped plaza

Public Record CentersHigh-density repositories engineered for retrieval speed and floor space.Open sector →

University campus building with clock tower

Universities & SchoolsStudent records, theses and library stacks with term-time peaks.Open sector →

Modern hospital building with glazed entrance

Hospitals & HealthcarePatient records, case histories and compliance retention under audit.Open sector →

Corporate headquarters building with glass facade

Enterprise & FinanceContract, invoice and audit files with finance-grade access control.Open sector →

The storage logic

Three parts, whichever sector you run.

Every system we ship — manual, electric or smart — is the same three-part machine. The sector only decides how the third part is operated.

01Fixed track

Rails carry the weight

Columns run on rails set into or onto the floor slab. The track carries the full loaded weight, so the slab is checked against the load drawing before anything is manufactured.

02Moving carriages

Whole rows, not single shelves

Each bay is a carriage that moves as one unit. Electric and smart drives move rows at the press of a button; manual systems use a three-spoke handwheel with a brake per bay.

03One shared aisle

The aisle opens where the request is

Only the aisle in use is open — every other aisle disappears into the stack. That single change is where the 70% floor-space saving comes from.

System fit

Which system each sector actually needs.

The drive type follows the retrieval pattern, not the budget. This is the same matrix our engineers apply when a tender lands on the desk.

Sector Typical load Recommended system Deciding requirement
Government Archives Permanent & periodic records, heavy box volumes Smart / Electric Access logging and classification tiers for audit.
Courts & Legal Case files, evidence, sealed exhibits Smart Chain of custody and tamper-evident locking.
Public Record Centers Very high density, infrequent batch retrieval Electric / Manual Floor space per linear metre of records.
Universities & Schools Student files, theses, library stacks Manual / Electric Term-time peaks and student-operator safety.
Hospitals & Healthcare Patient records with statutory retention Electric / Smart Retrieval speed during clinical rounds.
Enterprise & Finance Contracts, invoices, audit trails Manual / Electric Cost per stored box and daily office use.
Planning inputs

Four inputs that decide the configuration.

Send these four answers with your enquiry and the technical proposal comes back engineered, not estimated.

R

Retrieval frequency

How often files are pulled per bay per week. Daily retrieval justifies electric or smart drive; deep-store access can stay manual.

G

Growth headroom

Bays are specified 20–30% beyond current volume, so the last bay in the run is empty on commissioning day, not the first.

A

Operators & access

Who may open which aisle decides the authentication tier — open card access, per-operator passwords or dual-control vault bays.

S

Room constraints

Floor loading, slab thickness, ceiling height and fire zoning set the track layout and the maximum bay height we can propose.

11,000+Service cases
100+Countries served
70%Floor space saved
≥99.9%Positioning success

Start from the public-sector branch.

The three public-sector pages carry the detail most tenders ask for — retention schedules, custody chains and density maths. Or jump straight to a technical proposal with your room dimensions.

Enter public sector →