Resources · Procurement

From inquiry to handover, in five documented steps.

Buying a compact shelving system is a procurement exercise, not a catalogue order. Here is exactly how Hebei Shengmei Intelligent Group runs one — the five steps, the documents issued at each, and the commercial terms you can quote back to your own committee.

The process

Five steps, each closing with a document.

01

Inquiry

Room dimensions, bay count, load per shelf, usage and destination port. The more precise, the faster step two moves.

TD-CAT issued

Day 0
02

Quotation & drawings

General arrangement, load calculation and a priced specification against the model code you selected.

TD-GA · TD-LOAD

Within 5 days
03

Order & deposit

Contract signed against the approved drawing; production slot reserved once the deposit lands.

Signed contract

Day 5–10
04

Production & QC

Steel from certified mills, in-line inspection, factory load test and photo records before crating.

TD-INS pack opens

25–35 days
05

Delivery & handover

Export documentation, sea freight, installation record and acceptance certificate on site.

TD-WIR · TD-MAN · TD-OM

30–40 days at sea

Commercial terms

The numbers your committee will ask for.

Item Standard term
Minimum order 1 set per model code — mixed codes allowed in one 40HQ.
Lead time 25–35 days after deposit and approved drawings; smart terminals add 5–7 days.
Payment 30% T/T deposit, 70% against copy of B/L. L/C at sight accepted for orders above USD 50,000.
Trade terms FOB, CFR or CIF at the port of your choice; EXW available for container pickup.
Warranty 24 months on structure and drives from the acceptance date, lifetime technical support.
Sample policy Paid sample cabinets shipped within 10 days; sample cost refunded on the first production order.
Shengmei production workshop with roll-forming lines and coil steel
Who you are buying from

A manufacturer, not a trading desk.

Hebei Shengmei Intelligent Group is a national high-tech enterprise with a 100,000 m² self-owned production base and its own foreign-trade system — the company that quotes your project is the company that bends the steel and books the container.

Exports account for 45% of total revenue, so export documentation, packing and site coordination are part of the standard process rather than an exception.

100,000 m²Self-owned base
45%Export revenue
100+R&D staff

Start at step one.

Send your room dimensions and usage — the technical proposal with drawings and a priced specification comes back inside five working days.

Request technical proposal →