Civic and government district at dusk, aerial view

Applications · Public Sector

Public records answer to somebody.

Government archives, court files and public record centers share one trait: every retrieval must be provable. Shengmei compact shelving is engineered around that constraint — controlled access, logged operations and documentation that survives an audit decades later.

3Public-sector branches
30%Of our client base
PermanentRetention ready

What the sector demands

Three questions every public tender asks.

If a supplier cannot answer these in writing, the system is not designed for public service. Each one maps to a document in the technical registry.

Question 01

Who opened the aisle, and when?

Smart systems log every access by operator, time and bay — password, fingerprint or card. The access report exports with the O&M file.

Question 02

Will the records survive the room?

Integrated temperature and humidity monitoring with alarm thresholds keeps the storage envelope inside archive standards, season after season.

Question 03

Can you prove the system is safe?

Anti-pinch air-limiting devices, load tests and ISO 16063-5 / ISO/IEC 18093 compliance, stamped in the installation pack.

The three branches

Three public environments, three engineering answers.

Same steel, different duty. Each branch page carries the specifications, schedules and metrics its environment is judged on.

Government archive repository with manual compact shelving corridor
Branch 01

Government Archives

Retention schedules from permanent to ten-year classes, classification tiers and the access logs auditors sample.

Open branch →

Bright archive hall with courts records shelving
Branch 02

Courts & Legal Records

Case files and evidence under chain of custody, dual control and tamper-evident locking until certified disposal.

Open branch →

Wide aisle of electric compact shelving in a public record center
Branch 03

Public Record Centers

Repository-scale density: the floor-space maths, retrieval service levels and throughput a record center is run on.

Open branch →

Track record

Where public-sector systems are already running.

Four institution types account for most of our public installations — each with the configuration its duty demands.

National & provincial archivesSmart compact systems with tiered access, environmental monitoring and full audit logging across permanent holdings.
Courts & registriesEvidence-grade bays with dual-control sealed holdings and bay mapping keyed to case numbers.
Municipal record centersHigh-density electric wings planned around retrieval service levels and a public reading room.
Universities & institutesStudent-record and thesis archives sized for term-time retrieval peaks and safe student operation.

Procurement language

What to write into the tender.

Access control by tierPassword, fingerprint and card authentication per classification level, with per-operator permissions on the 15.6-inch terminal.
Operation loggingEvery open, close and retrieval logged with operator ID and timestamp; reports exportable for audit.
Environmental envelopeTemperature and humidity monitoring with alarm outputs, referenced to the archive-room standard.
Safety certificationAnti-pinch protection, load testing and ISO 16063-5 / ISO/IEC 18093 documentation in the acceptance pack.

The procurement route

From tender to handover, on a dated plan.

Public procurement lives on the calendar. This is the route a public-sector project takes from first enquiry to operators trained — each stage dated in the project schedule.

01

Tender review

We read the schedule of requirements and answer the three audit questions in writing.

Day 0–2

02

Room survey

Dimensions, floor loading and existing collections verified on site, photographed for the file.

Day 3–7

03

Technical proposal

Drawings, load calculations and a priced specification — the document the committee scores.

5 working days

04

Manufacture & install

Factory QA, container loading, on-site assembly with the resident supervisor’s sign-off.

25–35 days

05

Acceptance & training

Load tests, safety checks, operator training and the complete handover documentation set.

2–3 days

Bring us the tender.

Send the room dimensions and the records schedule — the technical proposal returns in five working days with drawings, load calculations and a priced specification.

Request technical proposal →